The number
before the number.
The price has already been paid.
Tennant has spent $59.1 million on ERP modernization. Lost $30 million in sales. Budgeted $5 million for remediation, now projecting $20+ million. Recovery is pushed to H1 2027. The node activates at $200,000 + $25,000/month. This page exists because the math was already decided before anyone asked.
What has the ERP disruption already cost Tennant?
Tennant disclosed a $30 million sales impact from the November 2025 ERP disruption, a $59.1 million total ERP investment in 2025, and remediation costs projected to exceed $20 million against an original $5 million budget. The recovery timeline has been pushed to H1 2027. These are public disclosures, not estimates.
What does the Tennant Node cost?
The Tennant Node activates at $200,000 one-time plus $25,000 per month operation. Total year-one cost: $500,000. This is separate from and does not compete with Tennant's existing SAP remediation budget. The node operates alongside SAP.
Year one total: $500,000 · Less than 1% of Tennant's 2025 ERP investment
What is the bleed avoided by activating the node?
Bleed avoided = monthly manual workaround cost × months until SAP recovery. Tennant's disclosed manual workaround costs — overtime, labor inefficiencies, overhead deleverage, premium freight, expedited freight — are the baseline. Recovery target is H1 2027. The node operates for the full wait window. Adjust the sliders to model the scenario.
- Activation
- $200K
- Monthly operation
- $25K/mo
- Total node cost (18mo)
- $650K
- Net benefit
- $10.15M
What are Tennant's options?
Three paths over the same 18-month window until H1 2027 recovery: Do Nothing, Remediate SAP Only, and Node + SAP Remediation. Same timeframe. Three different outcomes. The manual workaround cost is $10.8M in the first two paths and $0 in the third.
What happens when Tennant activates?
The math is not close. The node costs $500,000 in year one. The manual workaround costs $10.8 million over the same period. The recovery timeline doesn't move. The node doesn't ask Tennant to abandon SAP remediation — it asks them to stop paying manual labor to do what a signal layer should do. Activation is the decision. The math is already on the page.
Enterprise Strategic Asset Network · Federal Trade Secret · 18 U.S.C. §1832 Quantum Core